Operation CHARM: Car repair manuals for everyone.

Combination Valve For Secondary Air Injection (AIR), Checking Function and Proper Seal



Combination Valve For Secondary Air Injection (AIR), Checking Function And Proper Seal

Special tools and equipment







- VAG1390 Hand vacuum pump

Requirements
- Vacuum lines and hose connections leak-free.
- Vacuum lines not clogged.

Work sequence







- Remove rear engine cover (arrows).







- Remove bolts for holding plate for solenoid valves (arrows).
- Lift up holding plate and disconnect vacuum hose from Y-piece of combination valve to be checked.
- Connect VAG1390 hand vacuum pump to vacuum hose of combination valve to be checked.







- For vehicles with auxiliary heater, remove bolts (arrows) for exhaust pipe of auxiliary heater at sound insulation.







- Remove bolts or release quick-release screws -1- and -2- and remove front sound insulation.







- Disconnect pressure hose (arrow) at Secondary Air Injection (AIR) pump motor and blow into it with light pressure (do not use pressurized air).
- Both combination valves must be closed, it must not be possible to blow through hose
- Operate hand vacuum pump.
- Relevant combination valve must open, it must be possible to blow through

If the relevant combination valve does not open:
- Replace combination valve.




With Manufacturer's Scan Tool

Combination Valves For Secondary Air Injection (AIR) System, Checking Function And For Proper Seal

Recommended special tools and equipment







- VAG1390 Hand Vacuum Pump

Test requirements:
- No leaks in vacuum lines or hose connections.
- Vacuum lines not clogged.

Test sequence







- Remove rear engine cover (arrows).







- Remove bolts for holding plate for solenoid valves (arrows).
- Lift up holding plate and disconnect vacuum hose from Y-piece of combination valve to be checked.
- Connect e.g. V.A.G 1390 hand vacuum pump to vacuum hose of combination valve to be checked.







- Remove bolts or quick-release screws -1- and -2- and remove front sound insulation.







- Disconnect pressure hose (arrow) at Secondary Air Injection (AIR) pump motor and blow air in with light pressure (do not use pressurized air).
- Both combination valves must be closed, it must not be possible to blow through hose
- Operate hand vacuum pump.
- The relevant combination valve must open, it must not be possible to blow through

If respective combination valve does not open:
- Replace combination valve.

Final procedures
After repair work, the following work steps must be performed in the mentioned sequence:
1. Check DTC memory. Diagnostic Mode 03 - Read DTC Memory
2. If necessary, erase DTC memory. Diagnostic Mode 04 - Erase DTC Memory
3. If DTC memory was erased, generate readiness code.

- End diagnosis and switch ignition off.