Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Note
To Grind Valves, Add3.80.0A
With AC, Add
Right Bank0.40.0A
Left or Both Banks0.80.0A
One CYL
Right Bank10.60.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Left Bank10.10.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Both Banks14.10.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
All Cyls
Right Bank12.30.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Left Bank11.80.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Both Banks17.10.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.