Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.90.0AAdd The Following Operations If Performed Along Piston & Ring Jobs.
Crankshaft, Renew3.30.0AAdd The Following Operations If Performed Along Piston & Ring Jobs.
Oil Pump, Renew1.00.0AAdd The Following Operations If Performed Along Piston & Ring Jobs.
Oil Pump Screen, Clean0.20.0AAdd The Following Operations If Performed Along Piston & Ring Jobs.
Rear Main Oil Seal, Renew1.70.0AAdd The Following Operations If Performed Along Piston & Ring Jobs.
Timing Gears, Renew2.60.0AAdd The Following Operations If Performed Along Piston & Ring Jobs.
Tune-Up0.50.0ASee Valves Grind Head Removed And Combinatios.
One CYL8.55.5AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Note
With AC, Add0.70.4Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
With PS, Add1.00.7Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Each Additional0.70.4AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Note
With AC, Add0.70.4Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
With PS, Add1.00.7Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
All Cyls10.86.8AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Note
With AC, Add0.70.4Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
With PS, Add1.00.7Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.