Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.30.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Crankshaft, Renew3.50.0ADoes Not Include: R&R Engine.
Oil Pump, Renew0.60.0ADoes Not Include: R&R Engine.
Oil Pump Screen, Clean0.20.0ADoes Not Include: R&R Engine.
Rear Main Oil Seal, Renew1.10.0ADoes Not Include: R&R Engine.
Timing Chain or Gears, Renew1.10.0ADoes Not Include: R&R Engine.
Tune-Up0.60.0ASee Valves Grind Head Removed And Combinations.
Note
With AC, Add0.50.3AInclude: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
With C.C.C., Add0.50.3AInclude: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
With Cruise Control, Add0.40.2AInclude: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
With PS, Add0.70.4AInclude: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
One CYL
Right Bank8.35.3AInclude: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank8.25.2AInclude: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Each Additional0.70.4AInclude: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cyls
Right Bank9.56.5AInclude: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank9.46.4AInclude: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks13.98.9AInclude: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.