Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Camshaft, Renew5.80.0A
Main Bearing, Renew1.50.0A
Crankshaft, Renew6.80.0A
Oil Pump, Renew0.90.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Seal, Renew
Manual Trans2.00.0A
Auto Trans1.50.0A
Timing Chain, Renew1.90.0A
Valve Lifters, Renew
Right Bank3.00.0A
Left Bank2.70.0A
Both Banks3.40.0A
Tune-Up0.80.0A
Note
To Grind Valves, Add3.82.7A
With Folding Top, Add0.70.4A
One CYL
Right Bank15.110.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank13.29.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks19.714.1AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Each Additional0.70.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Right Bank16.812.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank14.810.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks22.716.2AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.