Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Each Additional0.70.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
One CYL16.712.1AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cyls18.813.1AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With Locking Wheel Covers or Lug Nuts, Add0.20.1A
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.00.0A
Oil Pump, Renew0.70.0A
Oil Pump Screen, Clean0.30.0A
Rear Main Oil Seal, Renew2.40.0A
Timing Chain, Renew1.20.0A
Crankshaft, Renew5.30.0A
Valve Lifters, Renew
Intake3.30.0A
Exhaust2.40.0A
Both3.70.0A
Camshaft, Renew
Intake3.30.0A
Exhaust2.40.0A
Both3.70.0A