Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Each Additional0.70.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
One CYL
Right Bank10.87.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank9.86.9AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks13.79.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cyls
Right Bank11.88.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank10.87.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks15.711.1AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
To Grind Valves, Add2.82.0A
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.00.0A
Oil Pump, Renew0.50.0A
Oil Pump Screen, Clean0.30.0A
Rear Main Oil Seal, Renew
Manual Trans2.60.0A
Auto Trans2.20.0A
Timing Chain, Renew1.80.0A
Crankshaft, Renew5.30.0A
Valve Lifters, Renew
Right Bank2.40.0A
Left Bank2.40.0A
Both Banks2.60.0A
Camshaft, Renew5.00.0A