Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Each Additional0.70.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
One CYL7.35.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cyls8.86.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With Auto Trans, Add0.50.3A
To Grind Valves, Add2.01.4A
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.40.0A
Oil Pump, Renew0.60.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew
Manual Trans1.40.0A
Auto Trans2.00.0A
Timing Chain, Renew1.70.0A
Tune-Up0.50.0A
Crankshaft, Renew
Manual Trans5.50.0A
Auto Trans5.20.0A