Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Each Additional0.70.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
One CYL7.35.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cyls8.86.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With Auto Trans, Add0.50.3A
To Grind Valves, Add2.01.4A
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.40.0A
Oil Pump, Renew0.60.0A
Oil Pump Screen, Clean0.30.0A
Rear Main Oil Seal, Renew
Manual Trans1.40.0A
Auto Trans2.00.0A
Timing Chain, Renew0.80.0A
Crankshaft, Renew
Manual Trans5.70.0A
Auto Trans5.40.0A
Camshaft, Renew
Manual Trans4.70.0A
Auto Trans4.60.0A