Operation CHARM: Car repair manuals for everyone.

Connecting Rod Bearing: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL3.60.0AIncludes: R&R Oil Pan & Plastigage Bearing.
Note
With Manual Trans, Add0.40.0A
With C.C.C., Add0.40.0A
Each Additional0.50.0AIncludes: R&R Oil Pan & Plastigage Bearing.
Main & Rod Bearings
Note
With Manual Trans, Add0.40.0A
One CYL7.00.0AIncludes: R&R Oil Pan & Plastigage Bearings.
Each Additional0.50.0AIncludes: R&R Oil Pan & Plastigage Bearings.