Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Camshaft, Renew0.20.0A
Crankshaft, Renew0.20.0A
Oil Pump Screen, Clean0.20.0A
Tune-Up0.90.0A
Note
To Grind Valves, Add3.50.0A
With AC, Add1.00.0A
With Cruise Control, Add0.50.0A
With PS, Add0.50.0A
With Manual Trans, Add0.40.0A
One CYL
Right Bank10.10.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank9.80.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks13.90.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Right Bank12.20.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank11.90.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks17.40.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.