| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
Replace |
Add Following Operations If Performed With Piston & Ring Jobs |
Main Bearings, Renew | 2.6 | 0.0 | A | Add The Following Operations If Performed Along With "Piston & Ring" Jobs. |
Crankshaft, Renew | 5.0 | 0.0 | A | Does Not Include: R&R Engine. |
Oil Pump, Renew | 2.5 | 0.0 | A | Does Not Include: R&R Engine. |
Oil Pump Screen, Clean | 0.2 | 0.0 | A | Does Not Include: R&R Engine. |
Timing Chain, Renew | 2.7 | 0.0 | A | Does Not Include: R&R Engine. |
Tune-Up | 0.6 | 0.0 | A | See Valves Grind Head Removed & Combinations |
Right Bank | 11.0 | 7.0 | A | Includes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings. |
Note |
With AC, Add | 0.5 | 0.3 | |