Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Camshaft, Renew2.00.0A
Main Bearings, Renew1.10.0A
Crankshaft, Renew3.60.0A
Oil Pump, Renew0.50.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Seal, Renew1.10.0A
Timing Chain, Renew1.10.0A
Valve Lifters, Renew1.60.0A
Tune-Up0.80.0A
One CYL
Right Bank8.15.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank7.85.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks11.68.3AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Right Bank10.27.3AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank9.97.1AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks15.110.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Note
To Grind Valves, Add3.52.5A
With AC, Add0.40.2A
With A.I.R., Add
Right Bank0.50.3A
Left Bank0.40.2A
Both Banks0.80.5A
With Manual Trans, Add0.70.4A
With Oil Cooler, Add0.20.1A
With Skid Plate, Add0.40.2A