Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Camshaft, Renew3.40.0A
Main Bearings, Renew1.20.0A
Crankshaft, Renew5.20.0A
Oil Pump, Renew0.60.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Seal, Renew1.10.0A
Timing Chain, Renew1.50.0A
Lifters, Renew
Right Bank1.40.0A
Left Bank1.40.0A
Both Banks1.60.0A
Tune-Up0.90.0A
Note
To Grind Valves, Add3.52.5A
With AC, Add1.00.7A
With Cruise Control, Add0.50.3A
With PS, Add0.50.3A
One CYL
Right Bank10.17.2AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank9.87.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks13.99.9AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Right Bank12.28.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank11.98.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks17.412.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.