Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.00.0A
Crankshaft, Renew4.60.0A
Oil Pump, Renew0.50.0A
Oil Pump Screen, Clean0.20.0A
Timing Chain, Renew1.30.0A
Tune-Up0.70.0A
Note
With AC, Add0.50.3A
With Cruise Control, Add0.40.2A
With PS, Add0.20.1A
With A.I.R., Add0.50.3A
To Grind Valves2.82.0A
One CYL
Right Bank8.86.3AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank8.76.2AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks12.79.1AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Right Bank10.27.3AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank10.17.2AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks15.110.8AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.