Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Camshaft, Renew3.40.0A
Main Bearings, Renew1.40.0A
Crankshaft, Renew5.20.0A
Oil Pump, Renew0.80.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Seal, Renew1.00.0A
Timing Chain, Renew1.50.0A
Rocker Arms, Renew
Right Bank0.80.0A
Left Bank0.90.0A
Both Banks1.30.0A
Lifters, Renew
Right Bank1.80.0A
Left Bank1.80.0A
Both Banks2.10.0A
Tune-Up0.90.0A
Note
To Grind Valves, Add3.52.5A
With AC, Add0.50.3A
With Cruise Control, Add0.20.1A
With Oil Cooler, Add0.40.2A
One CYL
Right Bank10.47.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank10.27.3AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks15.110.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Right Bank12.58.9AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank12.38.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks18.913.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.