Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Camshaft, Renew2.90.0A
Main Bearings, Renew1.40.0A
Crankshaft, Renew4.20.0A
Oil Pump, Renew0.90.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Seal, Renew1.60.0A
Timing Chain, Renew1.50.0A
Valve Lifters, Renew1.60.0A
Tune-Up0.80.0A
One CYL
Right Bank9.56.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank9.87.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks14.010.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Right Bank11.68.3AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank11.98.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks17.512.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Note
To Grind Valves, Add3.52.5A
With AC, Add0.40.2A
With A.I.R., Add
Right Bank0.50.3A
Left Bank0.40.2A
Both Banks0.80.5A
With Oil Cooler, Add0.20.1A
With Skid Plate, Add0.40.2A