Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Right Bank8.86.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank8.86.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks13.79.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Right Bank11.88.1AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank10.88.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks17.612.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.20.0A
Crankshaft, Renew4.20.0ADoes Not Include: R&R Engine.
Oil Pump, Renew0.60.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Seal, Renew
Manual Trans2.10.0A
Auto Trans0.90.0A
Timing Chain, Renew1.20.0A
Valve Lifters, Renew1.60.0A
Camshaft, Renew2.90.0A
Tune-Up0.80.0A
Note
With AC, Add0.70.4A
With PS, Add0.40.2A
With A.I.R., Add
Right Bank0.50.3A
Left Bank0.40.2A
Both Banks0.70.4A
With Cruise Control, Add0.20.1A
With Oil Cooler, Add0.20.1A