Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Right Bank10.87.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank9.87.3AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks14.710.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Right Bank12.78.9AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank12.78.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks18.813.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.40.0A
Crankshaft, Renew4.60.0A
Oil Pump, Renew0.70.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Seal, Renew1.30.0A
Timing Chain, Renew1.10.0A
Valve Lifters, Renew1.60.0A
Camshaft, Renew2.90.0A
Tune-Up0.80.0A
Note
With AC, Add0.50.3A
With Cruise Control, Add0.20.1A
With Oil Cooler, Add0.50.3A
To Grind Valves, Add3.52.5A