Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Right Bank8.05.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank8.05.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks11.88.3AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Right Bank9.87.3AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank9.87.1AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks14.710.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.10.0A
Crankshaft, Renew3.60.0A
Oil Pump, Renew0.70.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Seal, Renew1.10.0A
Timing Chain, Renew1.10.0A
Valve Lifters, Renew1.60.0A
Camshaft, Renew2.00.0A
Tune-Up0.80.0A
Note
With AC, Add0.40.2A
With Skid Plate, Add0.40.2A
With A.I.R., Add
Right Bank0.50.3A
Left Bank0.40.2A
Both Banks0.80.5A
With Manual Trans, Add0.70.4A
With Oil Cooler, Add0.20.1A
To Grind Valves, Add3.52.5A