Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Right Bank8.86.3AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank8.86.2AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks12.79.1AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Both Banks15.711.0AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Right Bank9.87.3AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank9.87.2AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Crankshaft, Renew4.60.0A
Main Bearings, Renew1.00.0A
Oil Pump, Renew0.50.0A
Oil Pump Screen, Clean0.20.0A
Timing Chain, Renew1.30.0A
Tune-Up0.70.0A
Note
With AC, Add0.50.3A
To Grind Valves, Add2.82.0A
With PS, Add0.20.1A
With A.I.R., Add0.50.3A
With Cruise Control, Add0.40.2A