Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Right Bank8.86.3AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank8.86.2AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks12.79.1AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Note
With AC, Add0.50.3A
To Grind Valves, Add2.82.0A
With PS, Add0.20.1A
With A.I.R., Add0.50.3A
With Cruise Control, Add0.40.2A
All Cyls
Both Banks14.710.8AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Right Bank9.87.3AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank9.87.2AIncludes: R&R Cylinder Head, Oil Pan, Hone Cylinders And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Crankshaft, Renew4.60.0A
Main Bearings, Renew1.00.0A
Oil Pump, Renew0.50.0A
Oil Pump Screen, Clean0.20.0A
Timing Chain, Renew1.30.0A
Tune-Up0.70.0A