Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Right Bank13.79.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank14.710.2AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks15.711.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Note
With AC, Add1.30.9A
To Grind Valves, Add3.52.5A
With Cruise Control, Add0.20.1A
With Oil Cooler, Add0.40.2A
All Cyls
Both Banks20.014.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Right Bank15.711.3AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank16.711.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Crankshaft, Renew5.20.0A
Main Bearings, Renew2.40.0A
Oil Pump, Renew1.80.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Seal, Renew1.10.0A
Rocker Arms, Renew
Right Bank0.80.0A
Left Bank0.60.0A
Both Banks1.00.0A
Timing Chain, Renew1.20.0A
Lifters, Renew
Right Bank1.80.0A
Left Bank1.70.0A
Both Banks2.00.0A
Camshaft, Renew3.30.0A
Tune-Up0.90.0A