Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Right Bank12.78.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank13.79.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks18.813.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Right Bank15.711.3AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank15.711.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks22.516.3AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.50.0A
Crankshaft, Renew5.30.0ADoes Not Include: R&R Engine.
Oil Pump, Renew1.10.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Seal, Renew1.40.0A
Timing Chain, Renew1.60.0A
Valve Lifters, Renew2.90.0A
Camshaft, Renew4.70.0A
Note
With AC, Add0.40.2A
With Cruise Control, Add0.20.1A
With Manual Trans, Add0.50.3A