Operation CHARM: Car repair manuals for everyone.

Connecting Rod Bearing: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL2.82.0AIncludes: R&R Oil Pan & Plastigage Bearing.
All Cyls5.23.7AIncludes: R&R Oil Pan & Plastigage Bearing.
Note
With A.I.R., Add0.40.2A
With Manual Trans, Add0.40.2A
With Oil Cooler, Add0.50.3A
With Strut Rods, Add0.50.3A
Main & Rod Bearings6.64.6AIncludes: R&R Oil Pan & Plastigage Bearings.
Note
With A.I.R., Add0.40.2A
With Manual Trans, Add0.40.2A
With Oil Cooler, Add0.50.3A
With Strut Rods, Add0.50.3A