Energy Storage Box (ESB) Fuse Power Cable Replacement
ENERGY STORAGE BOX (ESB) FUSE POWER CABLE REPLACEMENT
REMOVAL PROCEDURE
1. Remove the maxi-fuse.
2. Remove the fuse power cable nut (3) at the high current sensor.
3. Cut the tie straps (4) securing the fuse power cable to the ESB.
4. Remove the fuse power cable (2) from the fuse holder and high current sensor.
INSTALLATION PROCEDURE
1. Install the fuse power cable (2) to the fuse holder and high current sensor.
2. Install NEW tie straps (4) securing the fuse power cable to the ESB.
NOTE: Refer to Fastener Notice in Service Precautions.
3. Install the fuse power cable nut (3) at the high current sensor.
Tighten the nut to 10 N.m (89 lb in).
4. Install the maxi-fuse.