Energy Storage Box (ESB) Fuse Holder Replacement
ENERGY STORAGE BOX (ESB) FUSE HOLDER REPLACEMENT
CAUTION:
- To reduce the risk of severe shock and burns, disable the 42 volt (42V) system anytime you perform service work on or around the energy storage box (ESB). The 42V system will still be active after you have disabled the ESB.
- To reduce the risk of severe shock and burns, always disconnect the 42 volt (42V) energy storage box (ESB) before doing any work to the ESB system. To disconnect the ESB, turn the engine off and turn OFF the service disconnect switch, which is located on the passenger side of the ESB.
REMOVAL PROCEDURE
1. Remove the maxi-fuse.
2. Remove the fuse power cable from the fuse holder.
3. Remove the service disconnect power cable from the fuse holder.
4. Remove the fuse holder screws.
5. Remove the fuse holder.
INSTALLATION PROCEDURE
1. Install the fuse holder.
2. Install the fuse holder screws.
Tighten the screws to 2 N.m (18 lb in).
NOTE: Refer to Fastener Notice in Service Precautions.
3. Install the service disconnect power cable to the fuse holder.
4. Install the fuse power cable to the fuse holder.
5. Install the maxi-fuse.