Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
With 16 Valve
One Cylinder7.80.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Each Additional1.00.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew3.50.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Crankshaft, Renew3.50.0ADoes Not Include: R&R Engine.
Oil Pump, Renew0.70.0ADoes Not Include: R&R Engine.
Oil Pump Screen, Clean0.20.0ADoes Not Include: R&R Engine.
Rear Main Oil Seal, Renew1.50.0ADoes Not Include: R&R Engine.
Timing Belt, Renew0.80.0ADoes Not Include: R&R Engine.
Tune-Up0.50.0ASee Valves Grind Head Removed And Combinations.
Without 16 Valve
One Cylinder7.80.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Each Additional1.00.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew3.50.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Crankshaft, Renew3.50.0ADoes Not Include: R&R Engine.
Oil Pump, Renew0.70.0ADoes Not Include: R&R Engine.
Oil Pump Screen, Clean0.20.0ADoes Not Include: R&R Engine.
Rear Main Oil Seal, Renew1.50.0ADoes Not Include: R&R Engine.
Timing Belt, Renew0.80.0ADoes Not Include: R&R Engine.
Tune-Up0.50.0ASee Valves Grind Head Removed And Combinations.