Heated/Cooled Cupholder Switch - Installation
INSTALLATION
1. Position the heated/cooled cupholder switch (1) near the center floor console (2) and connect the wire harness connector to the switch.
2. Install the heated/cooled cupholder switch into the center floor console. Make sure the four retaining tabs are fully engaged.
3. Reconnect the negative battery cable.