Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder11.39.3AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew4.30.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Crankshaft, Renew4.70.0ADoes Not Include: R&R Engine.
Oil Pump, Renew1.50.0ADoes Not Include: R&R Engine.
Oil Pump Screen, Clean0.20.0ADoes Not Include: R&R Engine.
Rear Main Seal, Renew0.30.0AAfter Engine Or Trans Are Removed.
Timing Chain, Renew3.20.0AAfter Engine Or Trans Are Removed.
Valves, Grind
    See Valves, Grind Head Removed And Combinations.
Tune-Up0.60.0ASee Valves, Grind Head Removed And Combinations.
One Cylinder Each Bank13.810.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cylinders19.015.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.