Operation CHARM: Car repair manuals for everyone.

Test Y: The Panel/Floor and Cool/Warm Controls Are Inoperative Using The Front Auxiliary Climate Controls

PINPOINT TEST Y: THE PANEL/FLOOR AND COOL/WARM CONTROLS ARE INOPERATIVE USING THE FRONT AUXILIARY CLIMATE CONTROLS


Y1:






Y1-Y2:






Normal Operation
Under normal operation, the front auxiliary climate control assembly receives voltage from circuit 1003 (GY/YE) and ground from 1205 (BK).

Possible Causes
- An open in circuit 1003 (GY/YE) or 1205 (BK).
- Front auxiliary climate control assembly.