Output Shaft
Output Shaft
Disassembly
NOTICE: Hand-tighten the Bearing Puller to prevent gear damage.
NOTICE: Support the output shaft while using the press to prevent damage to the shaft or gears.
1. Remove the 5th/6th gear synchronizer assembly snap ring.
2. Using the Bearing Puller and a hydraulic press, remove the 5th/6th gear synchronizer assembly.
- Inspect the 5th/6th gear synchronizer assembly and the 6th gear synchronizer ring and cone for wear or damage. Install new components as necessary.
3. Remove the 6th gear.
- Inspect the 6th gear for wear or damage. Install a new gear as necessary.
4. Remove the 6th gear needle bearing.
- Inspect the 6th gear needle bearing for wear or damage. Install a new needle bearing as necessary.
5. Inspect the output shaft for scoring or worn or damaged splines. Install a new output shaft as necessary.
Assembly
NOTICE: Lubricate all components with the recommended transmission fluid before reassembling.
1. Position the 5th/6th gear synchronizer assembly on the Bearing Puller and a hydraulic press.
2. NOTICE: The 3 synchronizer ring tabs must engage into the 3 synchronizer assembly slots or damage to the synchronizer assembly and synchronizer ring can occur.
Install the 6th gear synchronizer ring and cone.
- Align the 3 synchronizer ring tabs with the 3 synchronizer assembly slots.
3. Install the 6th gear needle bearing.
4. Install the 6th gear.
5. Using the Bearing Puller and a hydraulic press, install the 5th/6th gear synchronizer assembly and the 6th gear.
6. Install the 5th/6th gear synchronizer assembly snap ring.