Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
All9.56.8Includes: R&R Cylinder Head, Oil Pan & Plastigauge Bearings.
Note
With AC, Add0.50.3A
To Replace Rod Bearings, Add0.80.5A
To Replace Main Bearings, Add1.51.1A
To Grind All Valves & Seats, Add4.53.2A
To Replace Bare Cylinder Head, Add2.21.6A
To Replace Camshaft & Rocker Arms, Add0.80.5A
To Replace Exhaust Manifold, Add0.80.5A
Add Following Operations If Performed With Piston & Ring Jobs
Crankshaft, Renew4.30.0A
Main Bearings, Renew1.30.0A
Oil Pump, Renew1.30.0A
Timing Belt, Renew1.00.0A
Tune-Up0.50.0A