VTC Actuator Inspection (PZEV Models)
VTC Actuator Inspection
1. Remove the cam chain Cam Chain Removal (PZEV Models).
2. Loosen the rocker arm adjusting screws Rocker Arm Assembly Removal (PZEV Models).
3. Remove the camshaft holder Rocker Arm Assembly Removal (PZEV Models).
4. Remove the intake camshaft.
5. Check that the variable valve timing control (VTC) actuator is locked by turning the VTC actuator counterclockwise. If it is not locked, turn the VTC actuator clockwise until it stops, then recheck it. If it is still not locked, replace the VTC actuator.
6. Seal the retard holes (A) in the No. 1 camshaft journal with tape and a wire tie.
7. Seal one of the advance holes (A) with tape.
8. Apply air to the unsealed advance hole to release the lock.
9. Check that the VTC actuator moves smoothly. If the VTC actuator does not move smoothly, replace the VTC actuator.
10. Remove the wire tie, the tape, and the adhesive residue from the No. 1 camshaft journal.
11. Make sure the punch marks on the VTC actuator and the exhaust camshaft sprocket are facing up, then set the camshafts in the cylinder head Rocker Arm Assembly Installation (PZEV Models).
12. Set the camshaft holders and cam chain guide B in place Rocker Arm Assembly Installation (PZEV Models).
13. Tighten the camshaft holder bolts to the specified torque Rocker Arm Assembly Installation (PZEV Models).
14. Hold the camshaft, and turn the VTC actuator clockwise until you hear it click. Make sure to lock the VTC actuator by turning it.
15. Install the cam chain Cam Chain Installation (PZEV Models).
16. Adjust the valve clearance Valve Clearance Adjustment (PZEV Models).