Shift Interlock Switch: Testing and Inspection
Park Pin Switch Test
1. Remove the center console Center Console Removal/Installation.
2. A/T gear position indicator panel light/park pin switch 6P connector (A) from the park pin switch (B).
3. Check for continuity between connector terminals No. 1 and No. 2.
There should be continuity.
- There should be continuity when the shift lever is moved out of P.
- There should be continuity when the shift lever is moved lever to P.
4. If the continuity is not as specified, replace the park pin switch Service and Repair.