Intake Manifold
Intake Manifold
Tighten the bolts and nuts sequentially in three steps. Always use a new intake manifold gasket.
Injector Base
Tighten the injector base mounting bolts/nuts (D) in a crisscross pattern in three steps, beginning with the inner nuts.