Main Relay (Computer/Fuel System): Testing and Inspection
CIRCUIT DIAGRAM
Using GST
HARNESS INSPECTION PROCEDURES
MFI Control Relay Inspection
NOTE: When applying battery voltage directly, make sure that it is applied to correct terminal. Otherwise, the relay could be damage.
1. Connect a 12V power supply (+) terminal to the terminal 6 of the MFI control relay and measure the voltages at terminal 2 when the (-) terminal is connected to and disconnected from the terminal 8.
2. Connect a 12V power supply (-) terminal to the terminal 10 of the MFI control relay and check the continuity between terminals 3 and 4 when the (+) terminal is connected to and disconnected from the terminal 7.
3. Connect a 12V power supply (+) terminal to the terminal 3 of the MFI control relay and measure the voltage at the terminal 4 when the (-) terminal is connected to and disconnected from the terminal 9.
4. If one of the above is improper, replace the MFI control relay.