Operation CHARM: Car repair manuals for everyone.

Component Inspection





Engine Control
P0625 Generator Field/ F Terminal Circuit Low - Component Inspection

Component Inspection

Check Generator
1. Engine starts.
2. Maintain ENG RPM 2,500 RPM over 2 minutes.
3. Measure voltage between the battery terminal (+) and the battery terminal (-).

Specification : Approx. 12.5 - 14.7 V

4. Is the measured voltage within specification?