Rocker Arm Assembly: Labor Times
Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
Replace | ||||
Rocker Arm | ||||
Right Bank | 2.0 | 1.4 | B | Includes: R&R Valve Cover. |
Left Bank | 4.6 | 3.0 | B | Includes: R&R Valve Cover. |
Both Banks | 5.9 | 4.0 | B | Includes: R&R Valve Cover. |
Rocker Arm Shaft | ||||
Right Bank | 2.0 | 1.4 | B | Includes: R&R Valve Cover. |
Left Bank | 4.6 | 3.0 | B | Includes: R&R Valve Cover. |
Both Banks | 5.9 | 4.0 | B | Includes: R&R Valve Cover. |