Operation CHARM: Car repair manuals for everyone.

Initial Inspection and Diagnostic Overview

Preliminary Check (Part 1 Of 2):




Preliminary Check (Part 2 Of 2):





Perform "LAN Communication Check" before starting with the following flow chart. If ignition switch is set in the "ACC" position in the step of START to ARMED or in the ARMED state shown in this flow chart, the system operation is canceled.


Note: Each switch operation can also be checked by ON-BOARD instead of CONSULT or TESTER in each of the Diagnostic Procedures.