Operation CHARM
: Car repair manuals for everyone.
Home
>>
Infiniti
>>
1996
>>
G20 L4-2.0L (SR20DE)
>>
Repair and Diagnosis
>>
Cruise Control
>>
Adjustments
>>
ASCD Wire
ASCD Wire
1.
Loosen locknut.
2.
With throttle closed, turn adjusting nut 1/2 to 1 turn in the direction that will loosen ASCD wire, then secure locknut.
3.
ASCD wire should not hold throttle open at idle position.