Multiple Junction Connector: Service and Repair
Installation:
Installation:
Install fuse Block (J/B) and SMJ, tighten bolts until orange "Full tight" mark appears and then retighten to specify torque as required.
CAUTION: Do not overtighten bolts, otherwise they may be damaged.