Removal and Installation
Removal and Installation
Observe the following to ensure proper servicing.
CAUTION:
- When removing, remove negative terminal first. But for installation, install positive terminal first.
- Tighten parts to the specified torque.
Battery fix frame mounting nut:
Tightening Torque: 3.5 - 5.3 N.m (0.36 - 0.54 kg-m, 31 - 46 in-lb)
Battery cable tightening nut:
Tightening Torque: 3.0 - 5.0 N.m (0.31 - 0.51 kg-m, 27 - 44 in-lb)