Solar Sensor: Testing and Inspection
COMPONENT INSPECTIONSunload Sensor
Measure voltage between display and A/C auto amp. harness connector M31 terminal 39 (LG) and ground.
If NG, replace sunload sensor.
- When checking sunload sensor, select a place where sun shines directly on it.