Operation CHARM: Car repair manuals for everyone.

Assembly Requirements



Inspection and Assembly Requirements

1. Check for leaks using ultraviolet (UV) Lamp.

NOTE:
- Any time a hose or component connection leak is observed, the component and fitting must be separated, cleaned and a new O-ring fitted and lubricated with air conditioning compressor oil.
- When separating A/C joints, cap the open connections immediately. Do not leave open to atmosphere.

2. O-ring seal surfaces must be free of dirt, lint, burrs and scratches.The O-ring and connector should be lubricated with air conditioning compressor oil.