Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Connecting Rod18.813.4AIncludes: R&R Head & Oil Pan, Hone Cylinder Walls And Plastigauge Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew0.70.0A
Crankshaft, Renew4.90.0A
Oil Pump, Renew0.40.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew4.80.0A
Timing Chain, Renew1.60.0A
Tune-Up0.70.0A