Refrigerant Pressure Sensor / Switch: Testing and Inspection
CONNECT ON MANIFOLD GAUGE SETDISCONNECT CONNECTOR FROM PRESSURE SWITCH
RUN ENGINE AT APPROX. 1,500 RPM
INSPECT PRESSURE SWITCH OPERATION:
a. Connect the positive (+) lead from the ohmmeter to terminal 4 and the negative (-) lead to terminal 1.
b. Check continuity between terminals when refrigerant pressure is charged, as shown in the illustration.
If operation is not as specified, replace the pressure switch.
STOP ENGINE AND DISCONNECT MANIFOLD GAUGE SET
CONNECT CONNECTOR TO PRESSURE SWITCH