Operation CHARM: Car repair manuals for everyone.

Installation









2UR-GSE STARTING: ENGINE SWITCH: INSTALLATION

2UR-GSE STARTING: ENGINE SWITCH: INSTALLATION

1. INSTALL ENGINE SWITCH






(a) Attach the 2 claws to install the switch.
(b) Connect the switch connector.
2. INSTALL INTEGRATION CONTROL PANEL WITH RADIO RECEIVER ASSEMBLY (w/o Navigation System) Installation

3. INSTALL MULTI-DISPLAY WITH RADIO RECEIVER ASSEMBLY (w/ Navigation System) Installation

4. INSTALL CENTER LOWER INSTRUMENT CLUSTER FINISH PANEL Installation

5. INSTALL NO. 3 INSTRUMENT PANEL REGISTER ASSEMBLY Installation

6. INSTALL CONSOLE BOX Installation

7. INSTALL CONSOLE BOX REGISTER ASSEMBLY Installation

8. INSTALL REAR ASH RECEPTACLE ASSEMBLY Installation

9. INSTALL FRONT ASH RECEPTACLE ASSEMBLY Installation

10. INSTALL CONSOLE PANEL SUB-ASSEMBLY Installation

11. INSTALL UPPER NO. 2 CONSOLE PANEL GARNISH Installation

12. INSTALL UPPER NO. 1 CONSOLE PANEL GARNISH Installation

13. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
14. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.