AR91.60-P-0611-05GZ Deployment of Airbag Units When No Deployment Device Is Present
AR91.60-P-0611-05GZ Deployment Of Airbag Units When No Deployment Device Is Present
Application of ignition cable to be shop made
1. Make the ignition cables at a length of at least 10 m with a pressure switch.
2. Plug the 2-pin plug into the corresponding airbag unit.
3. Connect ignition cables to the battery.
4. Press both pressure switches simultaneously.
5. For airbag units with 2 squibs, both must be triggered. To do this, repeat steps 2 through 4 after plugging the ignition cable into the second squib.
Keep to a safety distance of 10 meters to avoid being injured.