Operation CHARM: Car repair manuals for everyone.

Preparation For Test - Section 22



1. Battery voltage 11 - 14v.

2. Check fuses.

3. Systems and fluid levels in order.

Note: To prevent damage to the control modules refered to in ETP Test Steps, the connectors on the control modules must only be removed or installed with the ignition OFF.

Special Tools